New Giza University

Item Details

Data

  • Project: New Giza University
  • Location: Sheikh Zayed City
  • Total Capacity: 8000 RT
ECS succeeded to introduce the first LG centrifugal chiller to the Egyptian market through New Giza University project. ECS has awarded the first phase of the project  2 × 1350 RT LG centrifugal water cooled chillers working at 6.6 KV and 0.58 KW/RT. The total chilled water plant will reach 8000 RT

© 2014 ECS, inc. All rights reserved.

Navigation

Social Media