- Educational
- Administrative Buildings
- Banks
- Healthcare
- Malls & Hypermarkets
- Hotels
- Industrial
- Residential
- Infrastructure
Zewail City of Science and Technology
Supply 4 x 1400 RT LG chillers (Largest Direct Fired Absorption Chiller capacity in Egypt) with the highest COP 1.51 worldwide.
Egypt Japanese university
Supply 8 x 1150 RT LG Absorption chillers
New Giza University
Alex Desert Road
Supply 2 x 1350 LG Centrifugal Chillers working at medium voltage 6.6.
LEEDS International School
Mountain View I-City / 6th October
Turnkey for the mechanical works (HVAC, Firefighting, Plumbing and BMS).
Future University
Supply 2 x 200RT LG Absorption Chillers
Deraya Univeristy
Turnkey for MEP Works ( Electric , L.C , BMS , Fire Fighting , Plumbing and HVAC include 1000 TR LG VRF )
Metropolitan international school
New Cairo
Turnkey (Supply & Installation) of HVAC & Firefighting Works
GEMS international School
New Cairo
Supply and install LG VRF
New Alamein university
New Alamein City
LG VRF Supply
District Cooling Plant
Supply 10 × 1250 RT LG absorption chillers
with World-class COP 1.51
Bureau 175
Turnkey for MEP (HVAC, Firefighting, Plumbing and Electric, BMS and L.C Works). Supply 3 × 250 RT LG absorption chillers with high COP 1.35
City Stars - Capital A8
Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric and L.C Works) – Orange service center.
Eni Admin Building
New Cairo
Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric, BMS and L.C Works). Supply 2 × 190 RT LG absorption chillers
EITAT
Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric and L.C Works)
GIG Head Quarter
Turnkey for the mechanical works (HVAC, Firefighting, Plumbing and BMS).
Supply 2 × 280 RT LG absorption chillers with high COP 1.35
AXA HQ and Schlumberger Office
Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, BMS and L.C Works). Supply 2 x 360 RT LG Absorption Chillers
Namaa Real Estate -MetLife HQ
Turnkey (Supply & Installation) for the HVAC and BMS works.
Supply 2 x 250 RT LG Absorption Chillers
Petroleum Marine Services
Supply 2 x 360 RT LG Absorption Chillers.
World Class COP 1.51
Midor HQ
Turnkey ( Supply & Install) for the HVAC and BMS works.
Supply 2*560 RT LG Absorption Chillers
Water and Sanitation company
Giza
Supply 670 RT LG Absorption Chillers.
World-Class COP 1.51
Geyushi Motors
New Cairo
Turnkey (Supply & Installation) for the HVAC and BMS words. Supply 2 x 240 RT LG absorption Chillers.
Mentor Graphics
Supply and install 350 RT LG Absorption Chillers.
Turnkey Supply and installation for the HVAC works
Arabia for development & urban development
Supply 2 x 525 RT LG Absorption Chillers
Cairo business park
New Cairo
Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works and BMS
El Sallab Showroom
New Cairo
Supply 250 RT LG Absorption Chillers
Arabia for Urban & Development - Tycoons Building
New Cairo
Supply 2 x 525 RT LG Absorption Chillers
Dupont
New Cairo
Turnkey ( Supply & Installation ) of Mechanical works
General Office of Beni Suef Governorate
Beni Suef
Supply HVAC works using LG VRF system
Bavaria Showroom
Downtown – Cairo
Supply HVAC works using LG VRF system
Raya Data Center
New Cairo
Turnkey (Supply & Installation) of Mechanical Works
Majorel Admin office
New Cairo
Supply and install LG VRF
Fiber Misr - Benya Capital admin building
New Cairo
Mechanical Works include LG VRF
Human rights HQ
New Cairo
Supply and install LG VRF
Pharaonic Petroleum Co. - Admin Building
New Cairo
Supply HVAC Works using LG VRF System
Arab Bank HQ
New Cairo
Turnkey for the Mechanical (HVAC, BMS and Firefighting Works).
CIB - Commercial International Bank
Turnkey (Supply & Installation) of Mechanical Works
Banque Misr
Turnkey Supply and installation for the HVAC works using LG VRF System
NBE - National Bank of Egypt
Supply HVAC works using LG VRF System
QNB - HQ
Turnkey for Electric and light current Works
Al - Alamein Hospital
Supply HVAC works using LG VRF System 470 T.R
Abou Teeg Hospital
Asyut
Supply HVAC works using LG VRF System
Shefaa al Orman Hospital
Turnkey (Supply & Installation) for the Mechanical, Electric works, BMS & Medical gases
Abou El Reesh Japanese Hospital
Cairo
Mechanical Works include LG VRF System
Bahr al-Baqar hospital
Supply HVAC works using LG VRF System
Shabramant Hospital
Giza
Supply HVAC works using LG VRF System
Medical Park
New Cairo
Turnkey (Supply & Installation)
for the HAVC and BMS works including:
Supply 2 x 600 RT LG Absorption Chillers.
Rofayda Medical Center
Six of October city
Turnkey (Supply & Installation) for the mechanical works.
Supply 2 x 320 RT LG Absorption Chillers.
Damietta Clinics
Damyati
Supply HVAC works using LG VRF System
Samannud Hospital
Gharbia
Supply 2×150 RT LG Absorption Chillers
Tanta Hospital
Tanta City
Supply 4 x 395 RT LG Absorption Chillers
Dar El Oyoun Hospital
Six of October city
Supply 2 x 80 RT LG Absorption Chillers.
Al Qassaseen Hospital
Ismailia
Supply and installation for HVAC words using LG VRF System
Ramad Aswan
Aswan
Supply for the HVAC words using LG VRF System
Demerdash Hospital
Cairo
Supply and installation for HVAC words using LG VRF System
Aswan Fever Hospital
Aswan
Supply and installation for HVAC words using LG VRF System
The Arab contractors Medical Center
Nasr City – Cairo
Supply and Install 630 RT LG Absorption Chiller.
Porto Cairo Medical Center
New Cairo
Turnkey (Supply & Installation) for the chilled water plant including
Supply 2 x 200 RT LG Absorption Chillers.
Queens Royal Hospital
Heliopolis – Cairo
Operation & Maintenance for HVAC System using LG 120 RT Absorption Chiller
Elegantry Medical center
New Cairo
Turnkey Supply and installation for the HVAC works using LG VRF System 450 T.R
Nasaem Medical Park
New Cairo
Turnkey for the Mechanical (HVAC, Firefighting and BMS Works.
Supply 2 x 400 RT LG Absorption Chillers.
Well Care Hospital
New Cairo
Turnkey for the HVAC and BMS Works.
Supply 4 x 470 RT LG Absorption Chillers.
Egypt Air Hospital
Heliopolis – Cairo
Turnkey (Supply & Installation) for the chilled water plant.
Supply 500 RT LG Absorption Chiller.
New Giza Health Park
Alex Desert Road
Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works and BMS)
El Sallab Hospital
New Heliopolis City –
Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works, BMS and Medical Gases). Supply 3 × 400 RT LG absorption chillers with high COP 1.51
Al Mehwer Hospital
6th October City –
Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works, BMS and Medical Gases).
Supply 3 × 350 RT
Grand Medical - Ganen Hospital
New Cairo
Turnkey (Supply & Installation) for the chilled water plant.
Supply 2×300 RT LG Absorption Chiller.
Andalusia Hospital Extension
Maadi
Supply LG VRF
Sun oncology center
Alexandria
HVAC Works include LG VRF & VTS AHU
Galala Hospital
Galala City
7 Air-cooled Chillers
Suez Medical Complex
Suze
Supply for the HVAC words using LG VRF System and VTS AHUs
Nasr El Nouba Hospital
Aswan
Supply for the HVAC words using LG VRF System
El Alamein Tower - Entertainment Area
El Alamein
Turnkey for MEP works (HVAC, Firefighting, Plumbing, BMS, Electrical and L.C Works).
LG VRF System
Cleopatra Mall
Six of October city
Turnkey for the chilled water plant
Supply 7 x 1225 RT LG Absorption chillers
Raya Plaza - Galleria 40
Six of October city
ECS was awarded the design & built of Co-generation plant for Raya Plaza “Galleria Mall’s project; located in El Sheikh Zayed. The plant consists of 1 MW GE
Jenbacher’s gas generator set synchronized with the grid on low voltage for continuous operation. Furthermore, ECS’s approach was to utilize the exhaust waste heat, as well as jacket water to generate heat “hot water” which feeds a hot water absorption chiller at a capacity of 270 RT.
Garden 8
New Cairo
Turnkey for MEP works (HVAC, Firefighting, Plumbing, BMS, Electrical and L.C Works).
Supply 2 × 500 RT LG absorption chillers
Hurghada City Center Mall
Hurghada
Supply 4 x 750 RT LG Absorption Chillers.
World-Class COP 1.51 and first to the Egyptian Market
Genena Mall
Nasr City – Cairo
Supply 320 RT LG Absorption Chillers.
World-Class COP 1.51
Maxim Mall
New Cairo
Supply 3 * 600 RT LG Absorption Chillers
River Walk Mall
New Cairo
Supply 2 x 250 RT LG Absorption Chillers.
Leven Mall
New Cairo
Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works and BMS
The Gate Mall
Sheikh Zayed City
MEP Works include LG VRF
Fathallah Hyper Market - Damanhour Branch
Damanhour
Turnkey (Supply & Installations) of HVAC and firefighting system
Seoudi Market
Six of October city
Turnkey for the chilled water plant – Supply 240 RT LG Absorption Chillers. World Class COP 1.51
Zaha Mall
New administrative capital Egypt
Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works and BMS
Cairo Complex
Cairo
Supply 1 x 1200 RT LG Absorption Chillers.
World Class COP 1.51
Trivium Mall
New Cairo
Turnkey supply and installation for HVAC works using LG VRF system
Davos Mall
New Cairo
Turnkey (Supply & Installation) for the HVAC and BMS works. Supply 2 x 240 RT LG Absorption Chillers
Mahgoub for trading & importing
Nasr City – Cairo
Supply 180 RT LG Absorption Chiller
The Yard Mall
New Cairo
Turnkey for the chilled water plant , Supply 2 x 250 RT LG Absorption Chillers World Class COP 1.51
Semouha Mall
Alexandria
Supply 1250 RT LG Absorption Chiller with the highest COP 1.51 Worldwide & 1250 RT LG Centrifugal Chiller.
F45 Gym
New Cairo
Supply and install LG VRF
The Grocer Market
Marassi
Supply and install LG VRF
Jones the Grocer Market
New Cairo
Supply and install LG VRF
Sallab Mall ( Tarek al sallab )
New Cairo
MEP Works include LG VRF
Acacia Mall
New Cairo
MEP Works include LG VRF
Arena Mall
New Cairo
HVAC works include LG VRF
U-plaza Mall
Obour City
MEP Works include LG VRF
Ahalina Mall
Cairo
LG VRF Supply
Skyway Mall
New Cairo
Supply 500 TR LG VRF
Wadi Degla Club
6th of October City
Supply 2 x250 RT LG Absorption Chillers
Wadi Degla Club
New Cairo – Lotus
Supply 2 x 400 RT LG Absorption Chillers
Wadi Degla Club
Alexandria
Supply 2 x 320 RT LG Absorption Chillers
Galala Hotel and Resort
Ain Sokhna
Supply 3 x 1000 RT LG Absorption chillers
El Galala Tourist Resort
Ain Sokhna
Supply 3 x 800 RT LG Absorption chillers
Holiday Inn Hotel
Cairo
Dismantling and Renovation of the Firefighting & Plumbing works
Hilton Plaza Hurghada
Hurghada
Supply 3 x 800 RT LG Absorption Chillers.
Casa Cook Restaurant
El Gouna – Hurghada
Supply HVAC works using VRF system
Radisson Blu Hotel
Cairo
Supply HVAC works using LG VRF System.
Hilton Secon Nile Towers hotel
Cairo – Maadi
Supply 2 x 1100 RT LG Chillers. worlds Class COP 1.51
Four Seasons Hotel
Sharm El Shiekh
Supply HVAC works using LG VRF System
Power Generation Plant
The “Electrical Energy Station” has established to produce 20 MW of electricity. The project is totally financed by ECS Company based on “BOOT”
Turnkey Project (Civil, Architecture, HVAC, Firefighting, Electrical, Low Current, and Plumbing).
Sedico Pharma
6 of October City
Turnkey for MEP works (HVAC, Firefighting, Plumbing, BMS, Electrical and L.C Works).
Patchi Factory
Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric and L.C Works)
Nestle Warehouse - Al Amin trading
New Cairo – Katameya
Supply and install LG VRF.
Pepsico
Six of October city
Turnkey (Supply & Installation) of HVAC works Including;
Supply 240 RT LG Absorption Chiller
El Araby
Beni Suef
Supply 240 RT LG Absorption Chiller
Mina Pharmaceutical Company
10th Ramadan City
Supply 320 RT LG Absorption Chiller with capacity.
HIKMA Pharmaceutical Company - EPCI Factory
Beni Suef
Supply 240 RT LG Absorption Chiller
SAS Factory
10th Ramadan City
Supply 240 RT LG Absorption Chiller.
Edita Factory
10th Ramadan City
Supply 2 x 280 RT LG Absorption Chillers.
El Andalos Pharma
Supply 400 RT LG Absorption Chillers
Gentec Pharma
Six of October city
Supply 450 RT LG Absorption Chillers
Vitabiotics Pharma
Supply 500 RT LG Absorption Chillers
Zeta Pharma
El Sadat City
Supply 320 RT LG Absorption Chiller.
Arabcomed
Turnkey (Supply & Installation) for the chilled water plant.
Supply 400 RT LG Absorption Chiller.
Global Pharma Factory
Beni Suef
Supply 320 RT LG Absorption Chillers.
Utopia Pharma
Supply 2 x 500 RT LG Absorption Chillers. World-Class COP 1.51
Ateco Pharma
Ain Sokhna
Supply 2 x 500 RT LG Absorption Chillers.
La Poire
Supply 3 x 200 RT LG Absorption Chillers.
BAYER
New Cairo
Turnkey (Supply & Installations) of MEP works.
General Motors
Turnkey ( supply & Installation) for the HVAC works using LG VRF system
6th October Power Plant - 1200MW
6 of October City
Turnkey (Supply & Installation) of Mechanical Works.
Nerhadou Pharmaceutical Company
Six of October city
Supply 2 x 300 RT LG Absorption Chillers.
Rameda Pharma
Six of October city
Turnkey (Supply & Installation) for the chilled water plant.
Supply 2 x 600 RT LG Absorption Chillers.
Nestle Factory
Six of October city
Supply 2 x 205 RT LG Absorption Chillers.
Astrazeneca
New Cairo
Turnkey for the Mechanical Works
Techno Pharmaceuticals
Alexandria – Borg El Arab
Supply 500 RT LG Absorption Chiller
IBIS Pharma
Alexandria
Supply of 360 RT LG Absorption Chiller. Supply and install LG VRF
Aljazi
New Cairo
Supply 2 x 1100 RT LG Absorption Chiller with the highest COP 1.51 Worldwide
Forty West - Sodic - Phase 2
Six of October city
Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric and L.C Works).
Supply and install 76 outdoor and 500 indoor units using LG VRF system
Allegria Sodic West
Six of October city
Three Luxurious Villas
Turnkey (Supply & Installation) of Electromechanical works
Hyde Park
Supply 6x 210 RT LG Absorption Chillers.
Supply 4x 240 RT LG Absorption Chillers.
City View phase 2
Six of October city
Supply and install LG VRF
El Alamein Tower - Entertainment Area
El Alamein
Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)
Scope Details:
- 1500 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
- Nos 65 Manholes & Chambers Deferent Depths Up -7mt Depth
- 2500 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
- 2500 Mt Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
- Medium Voltage Substation 4 MG
- 65 Lighting Poles
New Giza Health Park - infrastructure
Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)
Scope Details:
- 3000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
- Nos 250 Manholes & Chambers Deferent Depths Up -7mt Depth
- 2500 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
- 30,000 Mt Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
- Medium Voltage Substation 4 MG
- 250 Lighting Poles
Town Center by Marakez
El – Salam district
Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)
Scope Details:
- 2000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
- Nos 110 Manholes & Chambers Deferent Depths Up -7mt Depth
- 4000 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
- 36000 KM Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
- Medium Voltage Substation 4 MG
Al-Alamein International University
Full MEP NetWork Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)
Scope Details:
- 3000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
- Nos 95 Manholes & Chambers Deferent Depths Up -7mt Depth
- 5000 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
- 36000 KM Electrical Cables (Medium Voltage , Low voltage and Low Current Cables
- Medium Voltage Substation 4 MG
- 250 Lighting Poles
Etapa - City Edge Development
Sheikh Zayed – October City
Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)
Scope Details:
- 3000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
- Nos 250 Manholes & Chambers Deferent Depths Up -7mt Depth
- 2500 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
- 30,000 Mt Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
- Medium Voltage Substation 4 MG
250 Lighting Poles
Cairo business park - infrastructure
Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)
Scope Details:
- 3000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
- Nos 250 Manholes & Chambers Deferent Depths Up -7mt Depth
- 2500 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
- 30,000 Mt Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
- Medium Voltage Substation 4 MG
- 250 Lighting Poles
Siemens - Ramsis Service center
Cairo
Turnkey Supply 1200 RT and installation for the HVAC works using LG VRF System.