Zewail City of Science and Technology

 6th October City

Supply 4 x 1400 RT LG chillers (Largest Direct Fired Absorption Chiller capacity in Egypt) with the highest COP 1.51 worldwide.

Egypt Japanese university

 Burj Al Arab – Alexandria

Supply 8 x 1150 RT LG Absorption chillers

New Giza University

 Alex Desert Road

Supply 2 x 1350 LG Centrifugal Chillers working at medium voltage 6.6.

LEEDS International School

 Mountain View I-City / 6th October

Turnkey for the mechanical works (HVAC, Firefighting, Plumbing and BMS).

Future University

New Cairo

Supply 2 x 200RT LG Absorption Chillers

Deraya Univeristy

 El Minya

Turnkey for MEP Works ( Electric , L.C , BMS , Fire Fighting , Plumbing and HVAC include 1000 TR LG VRF )

Metropolitan international school

 New Cairo

Turnkey (Supply & Installation) of HVAC & Firefighting Works

GEMS international School

 New Cairo

Supply and install LG VRF

New Alamein university

 New Alamein City

LG VRF Supply

District Cooling Plant

 New administrative capital Egypt

Supply 10 × 1250 RT LG absorption chillers
with World-class COP 1.51

Bureau 175

 New Cairo

Turnkey for MEP (HVAC, Firefighting, Plumbing and Electric, BMS and L.C Works). Supply 3 × 250 RT LG absorption chillers with high COP 1.35

City Stars - Capital A8

 Nasr City – Cairo

Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric and L.C  Works) – Orange service center.

Eni Admin Building

 New Cairo

Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric, BMS and L.C Works). Supply 2 × 190 RT LG absorption chillers

EITAT

 Heliopolis – Cairo

Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric and L.C  Works)

GIG Head Quarter

New Cairo

Turnkey for the mechanical works (HVAC, Firefighting, Plumbing and BMS).
Supply 2 × 280 RT LG absorption chillers with high COP 1.35

AXA HQ and Schlumberger Office

 New Cairo

Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, BMS and L.C Works). Supply 2 x 360 RT LG Absorption Chillers

Namaa Real Estate -MetLife HQ

 New Cairo
Turnkey (Supply & Installation) for the HVAC and BMS works.
Supply 2 x 250 RT LG Absorption Chillers

Petroleum Marine Services

New Cairo
Supply 2 x 360 RT LG Absorption Chillers.
World Class COP 1.51
Midor

Midor HQ

New Cairo
Turnkey ( Supply & Install) for the HVAC and BMS works.
Supply 2*560 RT LG Absorption Chillers

Water and Sanitation company

 Giza

Supply 670 RT LG Absorption Chillers.
World-Class COP 1.51

Geyushi Motors

 New Cairo

Turnkey (Supply & Installation) for the HVAC and BMS words. Supply 2 x 240 RT LG absorption Chillers.

Mentor Graphics

Heliopolis – Cairo
Supply and install 350 RT LG Absorption Chillers.
Turnkey Supply and installation for the HVAC works

Arabia for development & urban development

 New Cairo

Supply 2 x 525 RT LG Absorption Chillers

Cairo business park

 New Cairo

Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works and BMS

Ahmed el sallab

El Sallab Showroom

 New Cairo

Supply 250 RT LG Absorption Chillers

Arabia for Urban & Development - Tycoons Building

 New Cairo

Supply 2 x 525 RT LG Absorption Chillers

Tycoons Building

Dupont

 New Cairo

Turnkey ( Supply & Installation ) of Mechanical works

General Office of Beni Suef Governorate

Beni Suef
Supply HVAC works using LG VRF system

123

Bavaria Showroom

Downtown – Cairo
Supply HVAC works using LG VRF system

Raya Data Center

 New Cairo

Turnkey (Supply & Installation) of Mechanical Works

Majorel Admin office

 New Cairo

Supply and install LG VRF

Fiber Misr - Benya Capital admin building

 New Cairo

Mechanical Works include LG VRF

Human rights HQ

 New Cairo

Supply and install LG VRF

Pharaonic Petroleum Co. - Admin Building

 New Cairo

Supply HVAC Works using LG VRF System

Arab Bank HQ

New Cairo

Turnkey for the Mechanical (HVAC, BMS and Firefighting Works).

CIB-Smart-768x430

CIB - Commercial International Bank

 Six of October city

 

Turnkey (Supply & Installation) of Mechanical Works

Banque Misr

 Cairo & Alexandria

Turnkey Supply and installation for the HVAC works using LG VRF System

NBE - National Bank of Egypt

 Alexandria

Supply HVAC works using LG VRF System

QNB - HQ

Six of October city

 

Turnkey for Electric and light current Works

Al - Alamein Hospital

Alexandria

Supply HVAC works using LG VRF System 470 T.R

Abou Teeg Hospital

 Asyut
Supply HVAC works using LG VRF System

Shefaa al Orman Hospital

 Luxor
Turnkey (Supply & Installation) for the Mechanical, Electric works, BMS & Medical gases

Abou El Reesh Japanese Hospital

 Cairo
Mechanical Works include LG VRF System

Bahr al-Baqar hospital

 Sinai
Supply HVAC works using LG VRF System

Shabramant Hospital

 Giza

Supply HVAC works using LG VRF System

Medical Park

 New Cairo
Turnkey (Supply & Installation)

for the HAVC and BMS works including:

Supply 2 x 600 RT LG Absorption Chillers.

Rofayda Medical Center

 Six of October city
Turnkey (Supply & Installation) for the mechanical works.
Supply 2 x 320 RT LG Absorption Chillers.

Damietta Clinics

 Damyati

Supply HVAC works using LG VRF System

Samannud Hospital

 Gharbia

Supply 2×150 RT LG Absorption Chillers

Tanta Hospital

 Tanta City

Supply 4 x 395 RT LG Absorption Chillers

Dar El Oyoun Hospital

 Six of October city
Supply 2 x 80 RT LG Absorption Chillers.

Al Qassaseen Hospital

 Ismailia

Supply and installation for HVAC words using LG VRF System

Ramad Aswan

 Aswan

Supply for the HVAC words using LG VRF System

Demerdash Hospital

 Cairo

Supply and installation for HVAC words using LG VRF System

Aswan Fever Hospital

Aswan

Supply and installation for HVAC words using LG VRF System

The Arab contractors Medical Center

 Nasr City – Cairo

Supply and Install 630 RT LG Absorption Chiller.

Porto Cairo Medical Center

 New Cairo
Turnkey (Supply & Installation) for the chilled water plant including

Supply 2 x 200 RT LG Absorption Chillers.

Queens Royal Hospital

 Heliopolis – Cairo
Operation & Maintenance for HVAC System using LG 120 RT Absorption Chiller

Elegantry Medical center

 New Cairo

Turnkey Supply and installation for the HVAC works using LG VRF System 450 T.R

Nasaem Medical Park

 New Cairo
Turnkey for the Mechanical (HVAC, Firefighting and BMS Works.
Supply 2 x 400 RT LG Absorption Chillers.

Well Care Hospital

 New Cairo

 

Turnkey for the HVAC and BMS Works.
Supply 4 x 470 RT LG Absorption Chillers.

Egypt Air Hospital

 Heliopolis – Cairo
Turnkey (Supply & Installation) for the chilled water plant.
Supply 500 RT LG Absorption Chiller.

New Giza health park

New Giza Health Park

 Alex Desert Road

Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works and BMS)

El Sallab Hospital

 New Heliopolis City –

Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works, BMS and Medical Gases). Supply 3 × 400 RT LG absorption chillers with high COP 1.51

Mehwer

Al Mehwer Hospital

6th October City –

Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works, BMS and Medical Gases).
Supply 3 × 350 RT

Grand Medical - Ganen Hospital

New Cairo
Turnkey (Supply & Installation) for the chilled water plant.
Supply 2×300 RT LG Absorption Chiller.

Andalusia Hospital Extension

Maadi
Supply LG VRF

Sun oncology center

Alexandria
HVAC Works include LG VRF & VTS AHU

Galala Hospital

Galala City
7 Air-cooled Chillers

Suez Medical Complex

Suze

Supply for the HVAC words using LG VRF System and VTS AHUs

 

Nasr El Nouba Hospital

Aswan

Supply for the HVAC words using LG VRF System

 

El Alamein Tower - Entertainment Area

 El Alamein

Turnkey for MEP works (HVAC, Firefighting, Plumbing, BMS, Electrical and L.C Works).
LG VRF System

Cleopatra Mall

 Six of October city

Turnkey for the chilled water plant
Supply 7 x 1225 RT LG Absorption chillers

Raya Plaza - Galleria 40

 Six of October city
ECS was awarded the design & built of Co-generation plant for Raya Plaza “Galleria Mall’s project; located in El Sheikh Zayed. The plant consists of 1 MW GE
Jenbacher’s gas generator set synchronized with the grid on low voltage for continuous operation. Furthermore, ECS’s approach was to utilize the exhaust waste heat, as well as jacket water to generate heat “hot water” which feeds a hot water absorption chiller at a capacity of 270 RT.

Garden 8

 New Cairo
Turnkey for MEP works (HVAC, Firefighting, Plumbing, BMS, Electrical and L.C Works).
Supply 2 × 500 RT LG absorption chillers

Hurghada City Center Mall

 Hurghada
Supply 4 x 750 RT LG Absorption Chillers.
World-Class COP 1.51 and first to the Egyptian Market

Genena Mall

 Nasr City – Cairo
Supply 320 RT LG Absorption Chillers.
World-Class COP 1.51

Maxim Mall

 New Cairo

Supply 3 * 600 RT LG Absorption Chillers

River Walk Mall

 New Cairo
Supply 2 x 250 RT LG Absorption Chillers.

Leven Mall

 New Cairo

Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works and BMS

The Gate Mall

Sheikh Zayed City

MEP Works include LG VRF

Fathallah Hyper Market - Damanhour Branch

Damanhour

Turnkey (Supply & Installations) of HVAC and firefighting system

Seoudi Market

 Six of October city

Turnkey for the chilled water plant – Supply 240 RT LG Absorption Chillers. World Class COP 1.51

Zaha Mall

New administrative capital Egypt

Turnkey for MEP (HVAC, Firefighting, Plumbing,
Electric, L.C Works and BMS

CC-14

Cairo Complex

Cairo

Supply 1 x 1200 RT LG Absorption Chillers.
World Class COP 1.51

Trivium Mall

New Cairo

Turnkey supply and installation for HVAC works using LG VRF system

Davos Mall

New Cairo

Turnkey (Supply & Installation) for the HVAC and BMS works. Supply 2 x 240 RT LG Absorption Chillers

Mahgoub for trading & importing

Nasr City – Cairo

Supply 180 RT LG Absorption Chiller

Yard Mall -

The Yard Mall

New Cairo

Turnkey for the chilled water plant , Supply 2 x 250 RT LG Absorption Chillers World Class COP 1.51

Semouha Mall

Alexandria

Supply 1250 RT LG Absorption Chiller with the highest COP 1.51 Worldwide & 1250 RT LG Centrifugal Chiller.

F45 Gym

New Cairo

Supply and install LG VRF

The Grocer Market

Marassi

Supply and install LG VRF

Jones the Grocer Market

New Cairo

Supply and install LG VRF

Sallab Mall ( Tarek al sallab )

New Cairo

MEP Works include LG VRF

Acacia Mall

New Cairo

MEP Works include LG VRF

Arena Mall

New Cairo

HVAC works include LG VRF

U-plaza Mall

Obour City

MEP Works include LG VRF

Ahalina Mall

Cairo

LG VRF Supply

Skyway Mall

New Cairo

Supply 500 TR LG VRF

Wadi Degla Club

6th of October City

Supply 2 x250 RT LG Absorption Chillers

Wadi Degla Club

New Cairo – Lotus

Supply 2 x 400 RT LG Absorption Chillers

Wadi Degla Club

Alexandria

Supply 2 x 320 RT LG Absorption Chillers

Galala Hotel and Resort

 Ain Sokhna

Supply 3 x 1000 RT LG Absorption chillers

El Galala Tourist Resort

 Ain Sokhna

Supply 3 x 800 RT LG Absorption chillers

Holiday Inn Hotel

 Cairo
Dismantling and Renovation of the Firefighting & Plumbing works

Hilton Plaza Hurghada

 Hurghada
Supply 3 x 800 RT LG Absorption Chillers.

Casa Cook Restaurant

 El Gouna – Hurghada
Supply HVAC works using  VRF system

Radisson Blu Hotel

Cairo

Supply HVAC works using LG VRF System.

Hilton Secon Nile Towers hotel

 Cairo – Maadi

Supply 2 x 1100 RT LG Chillers. worlds Class COP 1.51

Four Seasons Hotel

Sharm El Shiekh

Supply HVAC works using LG VRF System

Power Generation Plant

Six of October city
The “Electrical Energy Station” has established to produce 20 MW of  electricity. The project is totally financed by ECS Company based on “BOOT”
Turnkey Project (Civil, Architecture, HVAC, Firefighting, Electrical, Low Current, and Plumbing).

Sedico Pharma

6 of October City
Turnkey for MEP works (HVAC, Firefighting, Plumbing, BMS, Electrical and L.C Works).

Patchi Factory

El Obour City

Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric and L.C Works)

Nestle Warehouse - Al Amin trading

New Cairo – Katameya
Supply and install LG VRF.

Pepsico

 Six of October city
Turnkey (Supply & Installation) of HVAC works Including;
Supply 240 RT LG Absorption Chiller

El Araby

 Beni Suef

Supply 240 RT LG Absorption Chiller

Mina Pharmaceutical Company

10th Ramadan City

Supply 320 RT LG Absorption Chiller with capacity.

HIKMA Pharmaceutical Company - EPCI Factory

 Beni Suef

Supply 240 RT LG Absorption Chiller

SAS Factory

 10th Ramadan City
Supply 240 RT LG Absorption Chiller.

Edita Factory

 10th Ramadan City
Supply 2 x 280 RT LG Absorption Chillers.

El Andalos Pharma

Six of October city
Supply 400 RT LG Absorption Chillers

Gentec Pharma

Six of October city

Supply 450 RT LG Absorption Chillers

Vitabiotics Pharma

Alexandria – Borg El Arab

Supply 500 RT LG Absorption Chillers

Zeta Pharma

El Sadat City
Supply 320 RT LG Absorption Chiller.

Arabcomed

El Obour City
Turnkey (Supply & Installation) for the chilled water plant.
Supply 400 RT LG Absorption Chiller.

Global Pharma Factory

Beni Suef
Supply 320 RT LG Absorption Chillers.

Utopia Pharma

10 Ramadan City
Supply 2 x 500 RT LG Absorption Chillers. World-Class COP 1.51

Ateco Pharma

Ain Sokhna
Supply 2 x 500 RT LG Absorption Chillers.

La Poire

Cairo
Supply 3 x 200 RT LG Absorption Chillers.

BAYER

New Cairo
Turnkey (Supply & Installations) of MEP works.

General Motors

6 of October City
Turnkey ( supply & Installation) for the HVAC works using LG VRF system

6th October Power Plant - 1200MW

6 of October City
Turnkey (Supply & Installation) of Mechanical Works.

Nerhadou Pharmaceutical Company

Six of October city

Supply 2 x 300 RT LG Absorption Chillers.

Rameda Pharma

Six of October city
Turnkey (Supply & Installation) for the chilled water plant.

Supply 2 x 600 RT LG Absorption Chillers.

Nestle Factory

Six of October city
Supply 2 x 205 RT LG Absorption Chillers.

Astrazeneca

New Cairo
Turnkey for the Mechanical Works

Techno Pharmaceuticals

Alexandria – Borg El Arab

 Supply 500 RT LG Absorption Chiller

IBIS Pharma

Alexandria

Supply of 360 RT LG Absorption Chiller. Supply and install LG VRF

Aljazi

 New Cairo

Supply 2 x 1100 RT LG Absorption Chiller with the highest COP 1.51 Worldwide

Forty West - Sodic - Phase 2

 Six of October city
Turnkey for the MEP (HVAC, BMS, Firefighting, Plumbing, Electric and L.C Works).
Supply and install 76 outdoor and 500 indoor units using LG VRF system

Allegria Sodic West

 Six of October city
Three Luxurious Villas
Turnkey (Supply & Installation) of Electromechanical works

Hyde Park

 New Cairo
Supply 6x 210 RT LG Absorption Chillers.
Supply 4x 240 RT LG Absorption Chillers.

City View phase 2

 Six of October city
Supply and install LG VRF

Empty tab. Edit page to add content here.

El Alamein Tower - Entertainment Area

 El Alamein

Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)

Scope Details:

  • 1500 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
  • Nos 65 Manholes & Chambers Deferent Depths Up -7mt Depth
  • 2500 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
  • 2500 Mt Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
  • Medium Voltage Substation 4 MG
  • 65 Lighting Poles

 

New Giza Health Park - infrastructure

Alex Desert Road

Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)

Scope Details:

  • 3000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
  • Nos 250 Manholes & Chambers Deferent Depths Up -7mt Depth
  • 2500 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
  • 30,000 Mt Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
  • Medium Voltage Substation 4 MG
  • 250 Lighting Poles

 

Town Center by Marakez

El – Salam district

Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)

Scope Details:

  • 2000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
  • Nos 110 Manholes & Chambers Deferent Depths Up -7mt Depth
  • 4000 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
  • 36000 KM Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
  • Medium Voltage Substation 4 MG

Al-Alamein International University

New Al-Alamein City

Full MEP NetWork Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)

Scope Details:

  • 3000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
  • Nos 95 Manholes & Chambers Deferent Depths Up -7mt Depth
  • 5000 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
  • 36000 KM Electrical Cables (Medium Voltage , Low voltage and Low Current Cables
  • Medium Voltage Substation 4 MG
  • 250 Lighting Poles

Etapa - City Edge Development

Sheikh Zayed – October City

Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)

Scope Details:

  • 3000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
  • Nos 250 Manholes & Chambers Deferent Depths Up -7mt Depth
  • 2500 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
  • 30,000 Mt Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
  • Medium Voltage Substation 4 MG
    250 Lighting Poles

Cairo business park - infrastructure

New Cairo

 

Full MEP Network Package ( Sewage –Storm – Irrigation – Domestic Water- Fire Fighting – Fire Fighting Pump Station – Medium Voltage – Low Voltage – Low Current – Street Lighting – Switchgear –Transformers – Low voltage substation)

Scope Details:

  • 3000 Sewage & Storm Network Pipes Deferent Diameters 50mm to 250mm
  • Nos 250 Manholes & Chambers Deferent Depths Up -7mt Depth
  • 2500 High density polyethylene Pipes With Deferent Diameter Up To 160mm Fire Pump Station 2000 GPM
  • 30,000 Mt Electrical Cables (Medium Voltage , Low voltage and Low Current Cables )
  • Medium Voltage Substation 4 MG
  • 250 Lighting Poles

Siemens - Ramsis Service center

Cairo

Turnkey Supply 1200 RT and installation for the HVAC works using LG VRF System.